Portfolio

Pearl 60

• Wall Replacement • Insulation replacement • Making a new frame for wall panels • Installation of wall and ceiling panels • Production and installation of furniture in cabins

MV Titan

• Dismantling wall and ceiling panels • Insulation Installation • Installation of flooring • Installation of wall and ceiling panels • Production and installation of furniture in cabins • Production and installation of a handrail

Trawler “Kholmogory”

• Floor covering installation 

Trawler “Tenor”

• Total interior refurbishment 

MY Victoria

• Interior outfitting

Private yacht

•  Turnkey interior outfitting with furniture manufacturing and installation; •  Project carried out in association with partner company PP Technosbyt

Icebreaker Suur Tõll (Estonia)

• Wheelhouse wooden cover replacment • Cabins interior work.

MV Stena Scandinavica (Sweden)

• Dismantle of WC-Units • Dismantle of wall and ceiling panels • Total number of demolished cabins- 220

SV Af Chapman (Sweden)

• Complete refurbishment of wooden deck (800m2) • Isolation materials installation • Wall and ceiling panels installation • Painting • Cabin furniture installation • Tile laying and sanitary blocks installation • Class B15 and A20 doors installation • Old furniture and accessories renovation • Galley montage and epoxy filling [...]

Passenger rivership Gogol (Russia)

• Sanitary system reconstruction • HVAC system reconstruction • Dining area outfitting

Escort tug Eridan (BLRT, Estonia)

• Isolation installation • Ventilation installation • Wall and ceiling panels installation • Floor covering • Fabrication and installation of furniture • Sanitary equipment installation • Galley and laundry equipment installation

Catamarans

• Isolation installation • Wall and ceiling panels installation • Floating floor and deck covering installation • Fabrication and installation of console in the wheelhouse • Fabrication and installation of furniture

Deep Cygnus (Norway)

• Isolation installation • Ventilation system construction • Wall and ceiling panels installation • Interior outfitting of cabins • Stainless steel installation • Tiles laying in bathrooms • Class B15 and A20 doors installation

MV Butterfly (Riga Latvia)

• Wall and ceiling panels manuf. and installation • Control panel design, manuf. and installation • Formica laying on the floor and filling of stitches with Sikaflex

Ferry Alandia (Eckero Line)

• Full Dismantling of living area • New steel bulkheads installation • Isolation installation • Ventilation system reconstruction • Wall and ceiling panels installation • Deck covering • Sliding fire doors installation • Commercial equipment installation • Stairways carpeting replacement

MV Klaudia Elanskaja

• Insulation installation • Installation of ventilation pipes • Installation of wooden wall and ceiling panels • Furniture installation • Installation of tiles and sanitary • Porthole installation

M/S Superstar (Tallink)

• Defective wall panels replacement in the cafeteria and bar • Perfume and distillery shop furniture alternation • Shop deck covering replacement • Cartpeting replacement in coridors • Furniture alternation in coridors • Antislip mounts replacement on the corners of gangways • Carpeting replacemt near information desk [...]

Norwegian Epic (STX Europe)

• Module cabin installation (1050 units on 5 decks) • Public area outfitting

Barge Aj96 Akva Group (Estonia)

• Turn Key project basis • Insulation installation • Outfitting • Furniture supply • Galley equipment supply • Laundry equipment supply

Barge 52834, 52837, 52838 Akva Group (Estonia)

• Turn Key project basis • Insulation installation • Outfitting • Furniture supply • Galley equipment supply • Laundry equipment supply

Floating Research Station (Tallinn, Estonia)

• Insulation installation • Self-levelling mixture application on the floor • Wall and ceiling panels installation • Suspended ceiling installation • Furniture installation • Tiles laying